System components
The system consists of the following components:
1. DUO Premium Slatted Cladding Board – 2,9 m
2. Joist – 20 x 40 mm
3. Finishing components:
|
DUO Corner Slatted Cladding Board |
Premium Corner Trim 4. Mounting clip + Torx stainless steel self-drilling screw |
List of tools required for installation:
● Miter or table saw – preferably with a metal/ aluminum blade with fine toothing or diamond finish
● Hammer drill with impact for installation of joists to concrete
● Screw gun – for convenience we recommend using two – one for drilling and one for screwing
● Locksmith hammer and rubber mallet
● Level
● Pencil
● Measuring tape
● Drill bit set: 6 mm for concrete, 6 mm for metal and 3 mm for metal
● Screwgun cutter (tapered chamfer)
● Bit torx T15
● Glue (optional)
● Quick-assembly or expansion dowels
● Dowel screws
Substrate: types and preparation for installation
Ecotravers slatted cladding boards should be installed on a previously prepared substrate. The substrate should be flat and strong. The prepared substrate should be in compliance with the applicable law and good building practices.
The instructions apply to the installation of a cladding board on a concrete substrate in a horizontal arrangement. Depending on your needs, the boards can also be installed vertically and on other types of substrate.
Slatted Cladding Boards can be installed on:
● concrete wall
● wooden wall
● openwork Construction
● wall with thermal insulation
● wall insulated with polystyrene foam – spot installation and on the entire wall
An exemplary installation of a cladding board on a wall with thermal insulation is provided at the end of the instructions.
Joist installation
The joists should be installed using quick-assembly dowels suitable for the wall. The distance between the dowels should be a maximum of 50 cm. The wall should be stable and flat. The joists should be laid in parallel to each other at maximum spacing of 500 mm from their center, with deep grooves on the visible side. Leave expansion gaps of 10 mm between the joist and the ground. The joists should be installed horizontally, parallel to the ground.
1. Drilling of the joist and milling of the hole
First drill the joist with a 6 mm metal drill, then place the joist against the wall and mark the drill holes in the substrate at approximately 50-60 cm intervals. After removing the joist, drill a hole in the substrate at the marked points. Drill into the joist alternately according to the picture below. Before installing the dowels, the holes must be milled with a countersink.
2. Joist installation to the substrate with quick-action dowels
The joist should be installed to the substrate using quick-fastening dowels. The choice of dowels depends on the type of wall material and the thickness of the insulation.
Cladding boards installation
1. Drilling the joist
Before installation, a guide opening needs to be drilled with a 3 mm diameter metal drill into the joist, to approximately half the depth of the joist. Failure to drill the joist may result in faulty installation of the clip and its uneven adhesion.
2. Installation of the first board
The boards are mounted to the joist structure with clips and screws in the milled areas of the joist. The installation starts by screwing the clips in place and then sliding the joist board into the clips. The clips should be installed at each board/joist joint
Mounting clip on the first board
Installation of a board with a clip to a joist
3. Installation of consecutive boards
Each consecutive board should be installed after the previous one has been screwed in place. Slide the clip into the previous board and screw it to the joist, then slide the next board in.
A mounting clip on the joint of the slatted boards
Installation of finishing components
We recommend that the finishing boards and trims are installed with the assistance of an additional person. For non-standard skirting installation, the installation hole must be drilled and milled in advance. Failure to drill may result in the trims breaking.
Corner trim 50 x 50
Place the trim against the board, then drill holes from above in the trim and board with a 3 mm diameter metal drill. Countersink the holes using a cutter (countersink).
If the holes are not drilled, the trims might break. Install the screws on a medium setting every 350 mm. A slight minimum expansion joint must be maintained between the two trims.
DUO Corner Board
The corner board has tongues on both sides. It is mounted to the joists with clips and screws in the same way as the slatted boards.
The board can be used as a corner board and after installing it you can continue the installation of the slatted boards or as the last board.
DUO corner board as a corner
DUO corner board as an end board
Mount the end side of the corner board with screws. First drill holes into the board from above with a 3 mm diameter drill. Countersink the holes using a cutter (countersink).
If the holes are not drilled, the boards may break. Mount the screws on a medium coupling every 350 mm.
Allowing for Expansion Gaps
When installing composite façade boards, it is essential to allow for appropriate expansion gaps. These gaps enable the material to expand and contract naturally due to changes in temperature and humidity, helping to prevent warping, cracking, or other damage.
Expansion gaps at board joints (lengthwise)
When joining boards lengthwise, please ensure the following:
- Leave a gap of at least 2 mm for every 1 running meter of board length;
- Use a double substructure – the ends of the boards must rest on separate joists and be fastened with separate screws or clips.
Expansion gaps near fixed elements
At the connection points between boards/joists and fixed construction elements (e.g., walls, ceilings, floors, roofs), a minimum expansion gap of 10 mm must be left to allow free movement of the material.
Installation with thermal insulation
Composite joist should be intalled using ventilated cladding brackets directly to the substrate every 50 cm. After mounting the brackets place insulation material between them. On the insulation layer place vapour-permeable foil, so that it can release water vapor. Then we install the joists on the foil and screw them to the brackets.
After that you can mount cladding boards – make sure to follow previously presented installation instructions.
Interior decorative installation
For indoor installation, installation on joists is not required. The boards can be screwed directly to the substrate or to wooden laths.


